Nigeria

Leading Commissioning Activities at One of Africa's Largest Cement Operations

Industrial commissioning is where engineering plans are tested against real-world operating conditions. At Dangote Cement's Ibese Plant in Nigeria, Rajesh Shah played a key leadership role during one of the most critical phases of the project — the transition from construction to successful plant operation.


Working as Deputy Manager (Electrical & Instrumentation), he led a multidisciplinary team of engineers while coordinating activities between FLSmidth, Dangote Cement and Petron Engineering. The role extended far beyond instrumentation alone. Responsibilities included planning and tracking commissioning schedules, coordinating electrical testing activities, verifying equipment readiness and ensuring smooth integration between electrical, instrumentation and automation systems.

Particular attention was given to the commissioning of process equipment, field instrumentation and plant automation systems that would ultimately control and monitor the entire cement manufacturing process. The project required constant coordination between equipment suppliers, contractors and plant personnel to ensure all systems were tested, calibrated and commissioned safely before startup.

In addition to commissioning responsibilities, Rajesh Shah later contributed to a major automation modernization initiative at the Ibese facility involving the migration of the control system from the original SINOMA platform to the FLSmidth ECS control system.

This project demanded careful planning and execution to ensure reliable process control while supporting long-term operational efficiency.

Key Contributions

  • Led a team of 8 engineers

  • Coordinated commissioning between client, contractor and OEM

  • Managed electrical testing schedules

  • Supported startup and operational stabilization

  • Automation migration from SINOMA to FLS ECS

  • Instrumentation and automation integration

Dangote Cement, Ibese, Nigeria

Edo Cement, Nigeria

Commissioning Nigeria's First 6000 TPD FLSmidth Cement Plant for BUA Group

The successful commissioning of a greenfield cement plant requires precise coordination between hundreds of interconnected systems. At Edo Cement, Rajesh Shah contributed to the commissioning of Nigeria's first 6000 TPD cement plant supplied by FLSmidth for the BUA Group.

The project involved supporting the integration and commissioning of instrumentation systems critical to plant operation and environmental compliance. A major focus of the project was the installation and commissioning of gas analyzer systems and stack emission monitoring equipment designed to support process optimization and regulatory requirements.

The work required close coordination with equipment suppliers, contractors and plant personnel to ensure all instrumentation systems were accurately calibrated, tested and integrated into the plant's automation architecture. The successful startup of the facility represented a significant milestone in Nigeria's industrial development and reinforced valuable experience in modern cement plant commissioning.

Key Contributions

  • Commissioning of 6000 TPD cement plant

  • Gas analyzer system installation

  • Stack emission monitoring systems

  • Instrument calibration and testing

  • Automation system integration

  • Startup support activities

Lafarge Cement, Calabar, Nigeria

Improving Process Reliability Through Instrumentation & Drive Systems

At Lafarge Cement's UCC Calabar facility, Rajesh Shah supported projects involving instrumentation and process control equipment critical to plant performance.

The scope included:

  • Pfister feeder systems

  • Schenck belt weighers

  • Field instrumentation

  • Low-voltage switchgear

  • Variable frequency drives


These systems play a vital role in maintaining process accuracy, stable material flow and reliable plant operation. The experience strengthened practical understanding of process measurement, electrical distribution systems and drive technologies used throughout cement manufacturing operations.

Key Contributions

  • Pfister feeder systems

  • Schenck belt weighing systems

  • Instrumentation integration

  • LV switchgear systems

  • VFD applications

Water Injection System Commissioning for Cement Mill Optimization

Efficient cement grinding operations depend heavily on maintaining proper process temperatures and mill operating conditions. At Lafarge Cement's Shagamu Plant, Rajesh Shah supported the commissioning of water injection systems for two cement mills. The project involved integrating instrumentation, control systems and process equipment required to maintain optimal mill operating temperatures and improve grinding performance.

The successful commissioning of the system contributed to improved process stability, enhanced mill efficiency and reliable operation of critical grinding assets.

Key Contributions

  • Water injection system commissioning

  • Cement mill process optimization

  • Instrumentation integration

  • Control system verification

  • Operational performance improvement

Lafarge Cement, Shagamu, Nigeria

© 2024. All rights reserved by NavalTecno Solutions.

info@navaltecno.in

+91 77260 66136
+91 77376 35411

** For complete content and best viewing experience, check out our website on desktop.